A Performance Stability System across changing market cycles
Better results require better thinking.
These are not “trainings.” They’re system installs designed to protect execution in the two phases that break performance: high-pressure pace spikes and slow-market drift. Start with the phase you’re in now — then deploy the second phase later when conditions flip.
New here? The Dealerships page explains the two patterns we solve. This page is for packaging and investment ranges.
How the Stability System works
Start with 1 workshop install (Dealership: 2–3 hours • Factory: 3–4 hours)
Use the Two-Group Option to keep the floor staffed
Add BDC / Service modules (60–90 min) to extend across departments
Use reinforcement cycles to prevent drift over time
Each install produces a concise leadership-ready snapshot showing where execution breaks (overload + drift) and what to stabilize first.
Scope & investment
Typical ranges vary by how much needs to be stabilized: headcount, cross-department handoffs, manager reinforcement needs, and whether this is a single install or a multi-step rollout to lock in adoption.
Three installs that protect performance across market phases
Each workshop is focused and specialized. You don’t have to “buy both” on day one. Most dealerships start with the workshop that matches their current phase, then deploy the second phase later when conditions flip.
Execution Under Pressure
Lock in follow-up reliability when pace is highest
Follow-up reliability + execution consistency under pace
Decision quality when attention is fragmented
Resets + protocols that survive real floor conditions
Performance Stability in Slow Markets
Stop drift, protect standards, preserve momentum
Drift detection + correction systems (standards don’t fade)
Protect training ROI when volume drops
Restore focus, accountability, and follow-through
Leadership Signals Under Pressure
Manager language + reinforcement rhythms that stabilize the floor
Reduce overload cascades triggered by leadership noise
Reinforcement protocols that actually stick
Consistency in expectations and execution standards
Department options (add-ons)
Extend consistency beyond the sales floor
The Stability System gets stronger when it reaches the departments where drift leaks revenue: BDC follow-up, service communication, and manager reinforcement.
BDC Reinforcement Option
Follow-up reliability systems that reduce drop-off and protect appointment flow when the floor is overloaded.
Pipeline friction map + handoff clarity (sales ↔ BDC)
Consistency scripts (not sales scripts) for reliability
Execution resets for high-volume days and slow phases
Service Reinforcement Option
Advisor & lane execution systems that protect trust, reduce overload, and support throughput under pressure.
Attention + communication protocols in the lane
Decision friction reduction (estimates, approvals, updates)
Standards reinforcement without burnout pressure
Manager Calibration Option
Leader language + reinforcement rhythm that prevents performance drift across departments.
Signal vs noise communication framework
Reinforcement cadence (weekly micro-checks)
Accountability without pressure amplification
Dealership packages & typical investment ranges
Choose an engagement model
Start with one phase, then expand into a market-cycle system. Add department modules if consistency is leaking outside the sales floor. Use reinforcement cycles to prevent drift over time.
Entry / Fast Impact
Single Workshop (Pick One)
A focused 2–3 hour install to map overload + drift points and deploy tools your team can apply immediately.
Typical investment: $3,500–$4,500 (on-site) • $2,000–$3,000 (virtual)
Includes
2–3 hour workshop install (on-site or virtual)
Overload map + friction points (your environment)
Tools + protocols applied live (not theory)
Leadership reinforcement language (starter set)
Best for
Most common starting bundle
Two-Workshop Core Bundle
Two installs delivered same day or scheduled apart to protect follow-through across market phases.
Typical investment: $7,000–$10,500
Includes
Execution Under Pressure (2–3 hours)
Performance Stability in Slow Markets (2–3 hours)
Manager close-out huddle (30–45 min)
Implementation checklist + scorecard
Best for
* Add the Two-Group Option if you need to keep the floor staffed. Add BDC and/or Service to extend across departments.
Add-on (floor coverage)
Two-Group Option (Group A / Group B)
Deliver the same workshop twice so the floor stays staffed while everyone gets the install.
Typical investment: +$2,000–$3,000 (add-on to any core workshop)
Includes
Same workshop delivered to Group A (2–3 hours)
Same workshop delivered to Group B (2–3 hours)
Group-to-group consistency + standards alignment
Leader guidance on scheduling + reinforcement
Best for
* This is the cleanest way to train the whole floor without sacrificing production.
Department expansion
Department Add-On Modules (BDC / Service / Managers)
Add a 60–90 minute module that installs department-specific protocols aligned to real workflows.
Typical investment: $2,000–$3,000 per department (on-site) • $1,000–$2,000 (virtual)
Includes
60–90 minute department module
Department-specific overload map + friction points
Protocols aligned to real workflows
Handoff clarity (sales ↔ BDC ↔ service touchpoints)
Reinforcement language for leaders
Best for
* Designed to attach to a core workshop or bundle — not generic stand-alone training.
Full dealership system
Performance Stability System (3-Workshop Install)
Your complete set: follow-through under pressure, slow-phase drift control, and leadership signal calibration.
Typical investment: $12,500–$19,000
Includes
All three core workshops (2–3 hours each)
Leadership Signals Under Pressure (includes +60 min leader segment)
Department handoff alignment (sales ↔ BDC ↔ service touchpoints)
90-day reinforcement plan + scorecard
Best for
* Recommended when inconsistency spans multiple teams and leaders — not just individual reps.
Slow-market protection plan
Slow-Phase Stabilization Bundle
Designed for dealerships in a down cycle: prevent drift, protect standards, and preserve training ROI.
Typical investment: $12,000–$18,000
Includes
Performance Stability in Slow Markets (2–3 hours)
Execution Under Pressure (2–3 hours)
Leadership Signals add-on segment (+60 min)
Reinforcement cadence for 6–12 weeks
Best for
* Built specifically for the phase where strong teams quietly drift below their potential.
Long-term reinforcement
Reinforcement & Update Cycles
Optional follow-ups every 3, 4, or 6 months to prevent drift and adapt as conditions change.
Typical investment: $2,500–$4,500 per session • $6,500–$12,000 (3-session package)
Includes
Drift check + system refresh
Updated overload map
New tools based on current constraints
Manager reinforcement adjustments
Best for
Engagement location
Nationwide engagements available. Rebel Minds Consulting works with organizations across the United States. On-site workshops and engagements are available nationwide; travel and accommodations are provided by the client.
Performance systems for production pressure & stability
Built for production environments where overload shows up as errors, rework, incidents, and supervisor burnout. This section is complete for credibility and scope — and we can fine-tune the exact content to your target factory profile.
Note: We can tailor these installs based on shift patterns, safety/quality priorities, supervisor span of control, and line variability.
Execution Stability Under Production Pressure
Stabilize output and reduce friction under real constraints
Reduce overload drivers that destabilize throughput
Clarify execution standards and decision points
Tools that survive shift realities
Error Prevention & Cognitive Load Reduction
Lower rework, mistakes, and quality drift
Attention + fatigue mitigation protocols
Decision friction reduction on critical steps
Error patterns mapped to cognitive load drivers
Supervisor Performance Under Pressure
Leader systems that protect stability, safety, and morale
Communication protocols that reduce chaos
Reinforcement rhythms that stick
Supervisor overload reduction + escalation clarity
Manufacturing packages & typical investment ranges
Choose an engagement model
Start with one workshop install or bundle into an operations stability system. Larger operations and multi-line programs can be quoted case-by-case.
Entry / Fast Impact
Single Workshop System Install (Pick One)
Start with one install to stabilize execution where breakdown is happening now (quality drift, errors, supervisor overload).
Typical investment: $5,500–$11,000 (half-day on-site) • $2,500–$5,500 (virtual)
Final pricing is confirmed after a quick scope call (team size, departments included, delivery format).
Includes
Half-day workshop install (3–4 hours) on-site or virtual
Overload + friction point map (process-level)
Tools + protocols installed live
Leader reinforcement language (starter set)
Best for
Most common system
Two-Workshop Operations Stability System
Bundle two installs to reduce error patterns that emerge under production pressure and keep standards from drifting.
Typical investment: $11,000–$24,000
Final pricing is confirmed after a quick scope call (team size, departments included, delivery format).
Includes
Execution Stability Under Production Pressure (half-day install)
Error Prevention & Cognitive Load Reduction (half-day install)
Supervisor reinforcement huddle (45–60 min)
Implementation checklist + scorecard
Best for
Full system
Three-Workshop Operations Stabilization System
The complete set: execution stability, error prevention, and supervisor performance under pressure.
Typical investment: $18,000–$45,000
Final pricing is confirmed after a quick scope call (team size, departments included, delivery format).
Includes
All three core workshops (half-day installs)
Supervisor reinforcement plan (8–12 weeks)
Communication + escalation clarity protocols
Optional reinforcement cycle roadmap
Best for
Expansion logic
Phase install → department extension → reinforcement cycles
The simplest path is usually the strongest: install the phase you need now, extend to the departments that leak consistency (BDC / Service), then reinforce so the system holds when leadership and market conditions change.
1) Install the phase you need now
Choose the workshop that matches your current reality (pressure spike or slow-market drift).
2) Extend across departments
Add BDC and/or Service modules when reliability breaks outside the sales floor.
3) Reinforce to prevent drift
Use 3–6 month update cycles to keep systems alive and aligned to current constraints.
Tip: If you want, we can later tighten these ranges into fixed “Good / Better / Best” packages once you settle on base rates.